
Ingest the set
Upload PDF, DWG, or RVT. Sheets classify automatically. The address overlays zoning, flood, wetland, and historic-district data.

Plans in. Contracts out.
Read the set, post quantified scopes to verified subcontractors, and lock permit accountability into every award.
0
50-sheet set classified and quantified
0
Permit outputs linked to adopted code
0
Sub fee on award, capped at $2,000
0
Live at launch, concrete through fire protection

Upload PDF, DWG, or RVT. Sheets classify automatically. The address overlays zoning, flood, wetland, and historic-district data.

Vision models detect walls, openings, fixtures, and panels, then quantify them into MasterFormat Scope Packages with source coordinates.

Post a package. Verified subs receive a takeoff-ready invite. Sealed bids open into a leveling table. Award writes the subcontract.
BuildScope is not a bid board. AI-generated Scope Packages are matched to subcontractors who are licensed, insured, and rated for the work— then every award feeds performance data back into the next match.

Pre-extracted bid package · takeoff already done
Review the AI-quantified Scope Package, adjust quantities, add notes, set a bid deadline.
One click invites ranked, pre-vetted subs. They receive the takeoff-ready package—not a 100-page blast.
Amounts stay hidden until the deadline. You see who was invited and who viewed the package.
Side-by-side bids with ratings and history. Award generates the subcontract with the scope as an exhibit.
Verified trade license in the project jurisdiction. Expired or invalid credentials suspend marketplace access automatically.
Bonding capacity checked against estimated scope value. COIs are parsed for limits and dates, with 30-day expiry flags.
Only subcontractors whose declared service area covers the jobsite receive the invitation.
Composite rating from safety, schedule, quality, and communication on prior platform work. Capacity signals weight the rank.
After the deadline, compare sealed bids side by side—rating, prior platform work, amount, and notes—then award without leaving the record.
| Subcontractor | Rating | Prior | Sealed bid |
|---|---|---|---|
| Terraline Concrete | 4.4 | 3 jobs | $0 |
| Cordero Structural | 4.8 | 11 jobs | $0 |
| Halvorsen Brothers | 4.6 | 7 jobs | $0 |
For GCs
$0 to post
General contractors pay no marketplace transaction fee. Post scopes, level bids, and award inside the Pro or Business plan.
For subcontractors
Free to bid
Receive matched invitations and submit sealed bids at no cost. Pay only when you win the work.
On award
4.5% · capped $2,000
Success fee on awarded subcontract value, paid by the subcontractor at signing. Compliance ledger activates the same moment.
The takeoff is not a summary paragraph. Each detection is a structured object—type, coordinates, confidence—so a quantity can always be traced to the geometry that produced it.

| Div | Package | Qty |
|---|---|---|
| 03 | Slab on grade, 4 in. | 3,480 SF |
| 03 | Continuous footings | 212 LF |
| 08 | Hollow metal doors and frames | 34 EA |
| 08 | Aluminum storefront | 486 SF |
| 09 | Gypsum board partitions | 5,140 SF |
| 26 | Branch circuits, 20A | 45 EA |
| 26 | Service upgrade, 200A | 1 EA |
When a subcontract executes, that trade's permits enter the project ledger with the sub as responsible party. Status changes are timestamped and immutable.

Building permit, tenant improvement
Meridian Builders
Electrical, 200A service upgrade
Vance Electric Co.
Mechanical, rooftop unit replacement
Ardmore Mechanical
Fire protection, sprinkler main relocation
Not yet awarded
Generative models never write the final permit list. A deterministic rule graph maps scope tags to adopted code sections—versioned, logged, and source-linked.
Personas are illustrative · not real customers

Paul · GC owner · 10–50 employees
Upload Monday. Competitive bids from verified subs by Wednesday—including firms you have never called. Save days of takeoff and often mid-single-digit percent on the package.

Maria · Compliance director · 100–500 employees
License status, insurance expiry, and permit acknowledgement—live across the portfolio. When a sub lets a credential lapse, access suspends before it becomes your liability.

Jose · Electrical sub · 15–40 employees
Matched invite: 200A service, 45 branch circuits, 120 fixtures. Pre-extracted sheets. Estimated takeoff time saved: hours. Free to receive work; 4.5% only when you win.
Up to 5 active projects. Plan analysis, scope decomposition, permit roadmap, marketplace posting, compliance dashboard.
$499/mo
Billed annually
Request accessUp to 25 active projects. Adds advanced sub management, white-labeled bid packages, code change monitoring, priority support.
$1,299/mo
Most chosen · billed annually
Request accessUnlimited projects. API, SSO, dedicated CSM, Procore and Autodesk integrations.
Custom
$3k–$8k/mo typical
Contact salesSubcontractor
Free
Receive matched invitations, submit sealed bids, manage awarded contracts and permit acknowledgements.
Sub Pro
$149/mo
Priority placement, instant trade alerts, portfolio showcase, historical pricing analytics.
On award
4.5%
Of awarded subcontract value, capped at $2,000 per contract. Charged only when the work is won.
Rules engine
Permit requirements execute against a versioned rule graph. Generative models are confined to interpreting unstructured plan notes.
Citations
Every requirement carries its issuing authority, the scope tag that triggered it, and a link to the municipal section in force.
Audit log
Every user action, contract event, and rule version used is recorded and cannot be rewritten after the fact.
Isolation
Bids, contract values, and pricing never cross between competing organizations. Enterprise adds dedicated schema isolation.
Encryption
Data encrypted at rest and in transit. SOC 2 Type II certification targeted within twelve months of launch.
Standing
Output is an advisory draft for professional review. BuildScope is not a licensed design, engineering, or legal service.
Send one plan set. We return quantified Scope Packages, matched marketplace invitations, and a source-linked permit roadmap.